Beyond Construction:

The Buckingham Group Fixed Price – No Surprise Guarantee

The Buckingham Group guarantees a fixed price with no surprises for the scope of work outlined in our specifications. Our contract payments are carefully synchronized, aligning  with the  progressive completion of work. Upon contract signing, this packet of information is coupled with a state of the art project management system. This comprehensive combination provides an unparalleled level of transparency for our remodels providing you with peace of mind knowing what your investment will be, and a projected date for when your remodel will be completed.

The difference between an estimate and a fixed price:

Many people are led to believe that an estimate represents the total cost of what a sketchy idea with limited drawings and specifications of their project will cost. Unfortunately, this is not the case. An estimate approximates what your remodel could potentially cost. Unfortunately, as the final design comes into focus the investment typically increases dramatically for all the items that were not included in the estimate or not priced to reflect your final choices. Examples of this dilemma could be in the choice of a bathroom lavatory faucet or a dishwasher for the kitchen where an allowance is included. Is it the $175.00 lavatory faucet and $250.00 dishwasher both of which have been designed to be in a land fill after a couple of years or one that will last for fifteen to twenty years? Further complications are grounded in the fact that an estimate is not considered a legally binding contract unless it is specifically stated as such.

In direct contrast to an estimate is the fixed price contract that is used by The Buckingham Group. It contains a comprehensive written scope of work document with incomparable detail on every phase of your remodel. The payment schedule is directly tied to a fixed price for the specified work and product content that are progressively delivered in clearly defined increments during construction. It is a legally binding document when accepted and signed by both parties and provides the comfort of financial stability for all.

Supplementing the fixed price of your project, we will, at your request, offer enhancements for alternate selections or construction modifications that you want to consider. These changes, or enhancements, generally do not change the function of the space, but offer aesthetic improvements that require an additional investment on your behalf. A good example would be in a kitchen where an exotic stone countertop, at an additional price, replaces the granite top specified in the contract. This change in material will not modify your cooking skills or the countertops durability. Its only purpose, if added, would be based on its aesthetic appeal to you. The enhancement’s description, coupled with the added investment required, will provide you with the financial information needed to make that decision.

Serving Metropolitan Tulsa, Oklahoma

The Buckingham Group 

4727 S. MEMORIAL DRIVE | TULSA, OK 74145 | 918-624-2666

Schedule a Conversation with The Buckingham Group

Simply fill out the form below and click Send.
Rest assured, your information is confidential and will not be shared with anyone outside The Buckingham Group organization. By providing your mobile phone number you consent to receive text messages sent by a representative of The Buckingham Group for marketing and/or scheduling purposes. Consent to these terms is not a condition of purchase.